- 2 min reading
At St. Nikolaus School in Erding, Germany, accessibility is part of everyday school life. Adapteo delivered a 1,584 m² temporary building with lift access, specialised care rooms and spaces planned around pupils and staff, giving the school room to continue while it prepares for a permanent extension.
1,584 m² of accessible learning space for St. Nikolaus School in Erding
St. Nikolaus School supports children, adolescents and young adults with disabilities, working closely with its affiliated therapeutic daycare centre. When a school like this needs temporary space, the building has to do more than provide classrooms. It needs to support pupils with different needs, help teachers and support staff work safely and confidently, and feel like a real part of everyday school life.
That was the task at St. Nikolaus School in Erding, Germany. While the school prepares for its permanent extension, a 1,584 m² temporary school building now gives pupils, teachers and support staff the space they need – without feeling like a compromise.
The three-storey building includes a double lift system, accessible sanitary facilities, hot-water heating, linoleum flooring, external blinds with central control, kitchenettes and a locking system adapted to the school’s needs.

An accessible school that supports everyday life
Principal Korbinian Müller explains what fully accessible means to him:
Spaces must be freely accessible for people with different impairments, for example those using wheelchairs, walkers or other mobility aids. Lift access is essential for our school. The sanitary facilities were also adapted to our needs. Two specialised care rooms were planned and built in.”
All floors are accessible and connected via an elevator. In addition to the double lift system, the staircases were fitted with fall-protection railings.
“The building is designed to make movement through the school as independent and straightforward as possible. Safety was also important, which is why the doors are fitted with special magnetic locks that can be released with a key or emergency button”, the principal explains.

Modular school building in three-storey construction
In addition to the internal requirements of the temporary modular school, the limited space on the school grounds posed an extra challenge in Erding – the existing trees had to be protected. The architects from hey! architektur and Adapteo succeeded in integrating the three-storey modular building harmoniously into the surroundings.
With limited space available on the school grounds, building upwards was the most practical solution. The three-storey design provides the space the school needs, while using as little ground area as possible.
Adapteo’s hybrid modular system combines steel and wood, making the building as sturdy as a permanent building. But – more flexible. The building’s modular structure and non-load-bearing walls make it easier to adapt if needs change over time. Extensions or additional floors can be planned easily, making the solution suitable for long-term use.
The permanent extension of St. Nikolaus School is planned for completion in 2029. The client, the Archdiocese of Munich and Freising, and the architecture firm hey! architektur from Munich are very satisfied with the temporary solution.

Need temporary school space that supports accessibility and everyday learning?
Temporary school buildings should still feel like real schools. With the right planning, they can support accessibility, comfort and daily routines – even when the need is urgent or the site is complex.
Adapteo helps schools and municipalities create flexible learning spaces that fit the people who use them.
Contact sales here.